Oil pipelines, oil product pipelines

  • Construction of the main oil product pipeline "Novopolotsk-Fanipol"

    Customer of the project: "Polotsktransneft Druzhba"

    Year of implementation: 2016-2019

    The purpose of the project: "Construction of the main oil product pipeline "Novopolotsk-Fanipol"

  • Design and survey works on the object: "Mozyr" - "Bernada-Pryluky"

    Project customer: “Gomeltransnafta Druzhba”

    Year of implementation: 2014-2016

    The purpose of the project: "Design and survey works on the object:" Construction of the main oil pipeline "Mozyr" - "Bernada-Pryluky"

  • Construction of the main oil product pipeline "Novopolotsk-Fanipol"

    Project customer: "Polotsktransnafta Druzhba"

    Year of implementation: 2015-2016

    The purpose of the project: "Construction of the main oil product pipeline" Novopolotsk-Fanipol ".

  • Main oil product pipeline "Novopolotsk - Fanipol"

    Feasibility study, project, working documentation, engineering research

    Project customer:

    OJSC Polotsktransnafta Druzhba (Republic of Belarus)

    Year of implementation: 2013

    The purpose of the project: organization of transportation of oil products of OJSC "NAFTAN" to the storage of oil products of the enterprise RUE "Belarusneft - Minskoblnaftoproduct" in Fanipol.

    Main technical characteristics:

    Oil pipeline

    The volume of pumping is 1.55 million tons / year

    The length is 293 km

    Diameter - 273 mm

    Number of pumping stations - 2

    GSMP

    The volume of the GNPS tank farm is 15 thousand m2

    • For diesel fuel - 9 thousands m3

    • for gasoline - 6 thousands m3

  • Main oil product pipeline "Mozyr - Bernady - Pryluky"

    THEO

    Project customer:

    OJSC Gomiltransnafta Druzhba (Republic of Belarus)

    Year of implementation: 2013

    The purpose of the project: the organization of sequential pumping of gasoline and diesel fuel from JSC "Mozyr Oil Refinery" to the oil depots Pinsk, Kobrin, Baranovichi, Volkovysk and the final point Bernady-Pryluky

    Main technical characteristics:

    The volume of pumping is 1.55 million tons / year

    The length of the linear part is 565 km - Highway - 456 km

    with a diameter of 325 mm - 233 km

    with a diameter of 273 mm - 225 km

    - Branches - 107 km

    with a diameter of 219 mm - 98 km

    with a diameter of 159 mm - 3 km

    with a diameter of 108 mm - 9 km

    Number of pumping stations – 3

  • Oil pipelines "Kalamkas - Karazhanbas - Aktau" and "Uzen - Zhetibay - Aktau", reconstruction

    Project

    Project customer: JSC "KazTransOil" (Republic of Kazakhstan)

    Year of implementation: 2013

    The purpose of the project: to increase the volume and expand the range of varieties of pumped oil (KMOK, "Buzachi", "Karazhanbas", "Dunga") in the direction of GSMP Uzen.

    Main technical solutions:

    • According to MN Kalamkas - Karazhanbas - Aktau on the section Karazhanbas - Aktau:

    - Repair of the linear part of DN 700

    - Construction of loopings from DN 500 pipes parallel to the operating pipeline

    - Locking of loopings on the highway on the II turn of construction

    • According to MN Uzen-Zhetibay-Aktau:

    - Repair of the II thread of the DN 500 oil pipeline

    - Construction on site of the I thread of loops from pipes DN 700 with the subsequent short circuit in an integral thread of a parallel direction on a site of GSMP Aktau - GNPS Uzen

    - Construction of jumpers DN 500, DN 700 between parallel oil pipelines

    • Reconstruction of SMP Karazhanbas, GNPS Aktau and GNPS Uzen

    Main technical characteristics:

    Volume of oil pumping on the site:

    - Karazhanbas - Aktau - 15.591 million tons / year

    - Aktau - Uzen - 17.191 million tons / year

    Number of SMP - 3

    The length of oil pipelines in the section "Karazhanbas - Aktau"

    - DN 700 (reconstruction) - 202.4 km

    including pipe replacement - 27 km

    - DN 500 (new construction) - 202.4 km

    Length of oil pipelines of the section "Aktau - Uzen"

    - I thread (DN 700) new construction - 141.6 km

    - II thread (DN 500) reconstruction - 112.0 km

  • The Zhulin-Nadvirna oil pipeline

    Feasibility study, route selection, engineering solutions, project, working documentation.

    Project customer:

    Branch of Druzhba Main Oil Pipelines of OJSC Ukrtransnafta (Ukraine)

    Year of implementation: 2002-2003

    The purpose of the project: to ensure the supply of Russian export mixture of oil and Azerbaijani oil from the existing Brody-State Border oil pipeline and oil from Dolyna oil and gas field (Ivano-Frankivsk region) to the refinery of OJSC "Petrochemical of Prykarpattia" (Nadvirna, Ivano-Frankivsk region).

    Main technical solutions:

    first turn

    • construction of a new section from the existing Dolyna Refinery to the Prykarpattia Oil Refinery OJSC;

    • use of the section of the existing Zhulin-Drohobych oil pipeline;

    • use of the section of the existing Dolyna-Drohobych oil pipeline;

    another turn

    • construction of a new section km25-KM0, DN 500 parallel to the existing Dolyna-Drohobych oil pipeline.

    The project envisages the reconstruction of SMP Dolyna with the installation of a commercial oil metering unit and the construction of the Nadvirna endpoint

    For the first time in Ukraine, CRC-EVANS automatic welding was used during the construction of the oil pipeline

    Main technical characteristics:

    The total length, including - 110 km

    New section Dolyna - Nadvirna Refinery - 48 miles

    The section of the existing Zhulin-Drohobych oil pipeline is 7 km away

    The section of the existing Dolyna-Drohobych oil pipeline is 25 km away

    Diameter:

    The new section Dolyna - Nadvirna Refinery - 530 mm

    The section of the existing oil pipeline Zhulin - Drohobych - 530 mm

    The section of the existing Dolyna-Drohobych oil pipeline is 273 mm

    Number of SMP - 2

    The volume of pumping is 2.23 million tons / year

    Promising volume of deliveries to Nadvirna refinery is 4.3 million tons / year

  • Brody oil pipeline - State border ("Dryzhba")

    Removal of the oil pipeline from the emergency zone at the section km 232 - km 285

    Pre-design proposals for options for removal of the route, engineering surveys, a project with the allocation of two stages of construction, working documentation on the stages of construction, author's supervision of construction.

    Project customer:

    Branch of Druzhba Main Oil Pipelines of OJSC Ukrtransnafta (Ukraine)

    Year of implementation: 2003

    The purpose of the project: removal of the pipeline from the emergency zone on the section km 232 - km 285 in connection with the intensification of landslides in the area of ​​the route

    Main technical solutions:

    • Application of welded straight seam pipes with factory insulation.

    • Insulation of welded joints with heat-shrinkable couplings.

    • Active isolation from soil corrosion by cathodic protection stations.

    • Installation of shut-off valves with intelligent electric drives, which are included in the automated control system of the oil pumping process.

    • Construction of fiber-optic communication line.

    • Installation of anti-erosion, fire-fighting structures within the boundaries of oil retention on the Latorytsia River.

    Main technical characteristics:

    The length of the pipeline removal route is 58.4 km

    Diameter:

    I thread - 530 mm

    II thread - 720 mm

  • Alibekmola-Kenkiyak oil pipeline

    Project

    Project customer:

    CJSC "KazTransOil" (Republic of Kazakhstan)

    Year of implementation: 2002

    The purpose of the project: to ensure the reception and storage of oil from the fields of the Aktobe region, transportation to the LVDS "Kenkiyak" for further transport to the export oil pipelines Atyrau - Samara and the CPC system.

    Main technical solutions:

    • GSMP "Alibekmola":

    - 6 steel tanks with a pontoon with a capacity of 5000 m 3 each;

    - pump shop - 3 pump units ANDS-600-90 with a capacity of 600 m 3 / year each;

    - site of filters-dirt traps;

    - oil metering unit;

    - site of safety valves;

    - drainage capacity;

    - cleaning and diagnostic start-up unit.

    • The oil pipeline from pipes 530х7 12GSB on TU 14-3R 34-2000 with factory isolation in 3 layers.

    Main technical characteristics:

    Pipeline length:

    Stage I - 16.0 km

    Stage II - 30.5 km

    Diameter - 530 mm

    The capacity of the tank farm is 30 thousand m3

    Oil pumping volume:

    Phase I - 3.6 million tons / year

    Phase II - 6.0 million tons / year

  • Odessa-Brody oil pipeline

    Feasibility study, working design, author's supervision of construction.

    Project customer:

    Branch of Druzhba Main Oil Pipelines of OJSC Ukrtransnafta (Ukraine)

    Year of implementation: 1996 - 2001

    The purpose of the project: pumping oil from ISTC "South" (port "South") to LVDS "Brody" for further supply to Ukrainian refineries and transit to Eastern Europe

    Main technical solutions:

    • Execution of a linear part of the oil pipeline from pipes with a diameter of 1020 mm, 12 mm thick with factory insulation.

    • Equipping with a telemechanics system (ASUTP) produced by MMT, Hungary.

    • Fiber optic (FOC) communication system.

    • Use of shut-off valves with drive type IQ, Rotork.

    • Starting and receiving unit of cleaning devices and diagnostic tools.

    Main technical characteristics:

    The length is 674 km

    Diameter - 1020 mm

    The number of intermediate NPS - 2

    Productivity of the launch complex is 9 million tons / year

    (without intermediate stations)

    Capacity for full development - 30 million tons / year

  • Matanzas - Cienfuegos oil pipeline

    Feasibility study, working design.

    Project customer:

    Supertanker Base Directorate in Matanzas, Cuba

    Year of implementation: 1992

    The purpose of the project: transportation of oil to the refinery in Cienfuegos.

    Main technical characteristics:

    The length of the pipeline is 190 km

    Diameter - 530 mm

    Number of SMP - 2

    Capacity - 10 million tons / year

  • Samgori-Batumi oil pipeline

    Project, working documentation, author's supervision of construction.

    Project customer: Gruznafta (Georgia)

    Year of implementation: 1980

    The purpose of the project: transport of Georgian oil to the refinery in Batumi.

    Main technical characteristics:

    The length of the route is 426 km

    Diameter - 530 mm

    Capacity - 4.8 million tons / year

    The capacity of the tank farms is 35 thousand m3

    Number of SMP - 2

    Number of draining stations – 2

  • Oil pipeline Kalamkas - Karazhanbas - Aktau (Shevchenko)

    Project, working documentation, author's supervision of construction.

    Project customer: Yuzhnaftoprovod (USSR)

    Year of implementation: 1975

    The purpose of the project: transportation of high-viscosity Kazakh oils to the port of Aktau for further filling into tankers and sending to refineries in Baku, Volgograd and others.

    Main technical characteristics:

    The length of the route is 283 km

    Diameter - 720 mm

    Capacity - 15 million tons / year

    The capacity of the tank farms is 100 thousand m3

    Number of SMP - 3

    End point – 1

  • The Uzen-Atyrau-Samara oil pipeline

    Project, working documentation.

    Project customer:

    Ministry of Oil Industry of the USSR

    Year of implementation: 1971

    The purpose of the project: transportation of oil with high paraffin content to the refineries in Atyrau and Samara, as well as to railway filling stations.

    Main technical solutions:

    • The pipeline is equipped with oil heating points. Each SMP has 8 G9PO2V furnaces with a capacity of 600 m 3 / hour. The pumping temperature is about 60 ° C.

    • The pipeline is equipped with automation and telemechanics.

    Main technical characteristics:

    The length of the pipeline is 1500 km

    Diameter:

    - on the section Uzen-Atyrau (L = 683 km) - 1020 mm

    - on the section Atyrau-Samara - 720 mm

    Bandwidth:

    - on the Uzen-Atyrau section - 40 million tons / year

    - on the Atyrau-Samara section - 17 million tons / year

    Reservoir tank capacities:

    - GSMP "Uzen" - 120 thousand m3

    - SMP "Atyrau" - 180 thousand m3

    Number of SMP - 8

Address: 60 Sichovykh Striltsiv str., Kyiv, 04050, Ukraine
Email: itn@itn.ua