Customer of the project: "Polotsktransneft Druzhba"
Year of implementation: 2016-2019
The purpose of the project: "Construction of the main oil product pipeline "Novopolotsk-Fanipol"
Project customer: “Gomeltransnafta Druzhba”
Year of implementation: 2014-2016
The purpose of the project: "Design and survey works on the object:" Construction of the main oil pipeline "Mozyr" - "Bernada-Pryluky"
Project customer: "Polotsktransnafta Druzhba"
Year of implementation: 2015-2016
The purpose of the project: "Construction of the main oil product pipeline" Novopolotsk-Fanipol ".
Feasibility study, project, working documentation, engineering research
Project customer:
OJSC Polotsktransnafta Druzhba (Republic of Belarus)
Year of implementation: 2013
The purpose of the project: organization of transportation of oil products of OJSC "NAFTAN" to the storage of oil products of the enterprise RUE "Belarusneft - Minskoblnaftoproduct" in Fanipol.
Main technical characteristics:
Oil pipeline
The volume of pumping is 1.55 million tons / year
The length is 293 km
Diameter - 273 mm
Number of pumping stations - 2
GSMP
The volume of the GNPS tank farm is 15 thousand m2
• For diesel fuel - 9 thousands m3
• for gasoline - 6 thousands m3
THEO
Project customer:
OJSC Gomiltransnafta Druzhba (Republic of Belarus)
Year of implementation: 2013
The purpose of the project: the organization of sequential pumping of gasoline and diesel fuel from JSC "Mozyr Oil Refinery" to the oil depots Pinsk, Kobrin, Baranovichi, Volkovysk and the final point Bernady-Pryluky
Main technical characteristics:
The volume of pumping is 1.55 million tons / year
The length of the linear part is 565 km - Highway - 456 km
with a diameter of 325 mm - 233 km
with a diameter of 273 mm - 225 km
- Branches - 107 km
with a diameter of 219 mm - 98 km
with a diameter of 159 mm - 3 km
with a diameter of 108 mm - 9 km
Number of pumping stations – 3
Project
Project customer: JSC "KazTransOil" (Republic of Kazakhstan)
Year of implementation: 2013
The purpose of the project: to increase the volume and expand the range of varieties of pumped oil (KMOK, "Buzachi", "Karazhanbas", "Dunga") in the direction of GSMP Uzen.
Main technical solutions:
• According to MN Kalamkas - Karazhanbas - Aktau on the section Karazhanbas - Aktau:
- Repair of the linear part of DN 700
- Construction of loopings from DN 500 pipes parallel to the operating pipeline
- Locking of loopings on the highway on the II turn of construction
• According to MN Uzen-Zhetibay-Aktau:
- Repair of the II thread of the DN 500 oil pipeline
- Construction on site of the I thread of loops from pipes DN 700 with the subsequent short circuit in an integral thread of a parallel direction on a site of GSMP Aktau - GNPS Uzen
- Construction of jumpers DN 500, DN 700 between parallel oil pipelines
• Reconstruction of SMP Karazhanbas, GNPS Aktau and GNPS Uzen
Main technical characteristics:
Volume of oil pumping on the site:
- Karazhanbas - Aktau - 15.591 million tons / year
- Aktau - Uzen - 17.191 million tons / year
Number of SMP - 3
The length of oil pipelines in the section "Karazhanbas - Aktau"
- DN 700 (reconstruction) - 202.4 km
including pipe replacement - 27 km
- DN 500 (new construction) - 202.4 km
Length of oil pipelines of the section "Aktau - Uzen"
- I thread (DN 700) new construction - 141.6 km
- II thread (DN 500) reconstruction - 112.0 km
Feasibility study, route selection, engineering solutions, project, working documentation.
Project customer:
Branch of Druzhba Main Oil Pipelines of OJSC Ukrtransnafta (Ukraine)
Year of implementation: 2002-2003
The purpose of the project: to ensure the supply of Russian export mixture of oil and Azerbaijani oil from the existing Brody-State Border oil pipeline and oil from Dolyna oil and gas field (Ivano-Frankivsk region) to the refinery of OJSC "Petrochemical of Prykarpattia" (Nadvirna, Ivano-Frankivsk region).
Main technical solutions:
first turn
• construction of a new section from the existing Dolyna Refinery to the Prykarpattia Oil Refinery OJSC;
• use of the section of the existing Zhulin-Drohobych oil pipeline;
• use of the section of the existing Dolyna-Drohobych oil pipeline;
another turn
• construction of a new section km25-KM0, DN 500 parallel to the existing Dolyna-Drohobych oil pipeline.
The project envisages the reconstruction of SMP Dolyna with the installation of a commercial oil metering unit and the construction of the Nadvirna endpoint
For the first time in Ukraine, CRC-EVANS automatic welding was used during the construction of the oil pipeline
Main technical characteristics:
The total length, including - 110 km
New section Dolyna - Nadvirna Refinery - 48 miles
The section of the existing Zhulin-Drohobych oil pipeline is 7 km away
The section of the existing Dolyna-Drohobych oil pipeline is 25 km away
Diameter:
The new section Dolyna - Nadvirna Refinery - 530 mm
The section of the existing oil pipeline Zhulin - Drohobych - 530 mm
The section of the existing Dolyna-Drohobych oil pipeline is 273 mm
Number of SMP - 2
The volume of pumping is 2.23 million tons / year
Promising volume of deliveries to Nadvirna refinery is 4.3 million tons / year
Pre-design proposals for options for removal of the route, engineering surveys, a project with the allocation of two stages of construction, working documentation on the stages of construction, author's supervision of construction.
Project customer:
Branch of Druzhba Main Oil Pipelines of OJSC Ukrtransnafta (Ukraine)
Year of implementation: 2003
The purpose of the project: removal of the pipeline from the emergency zone on the section km 232 - km 285 in connection with the intensification of landslides in the area of the route
Main technical solutions:
• Application of welded straight seam pipes with factory insulation.
• Insulation of welded joints with heat-shrinkable couplings.
• Active isolation from soil corrosion by cathodic protection stations.
• Installation of shut-off valves with intelligent electric drives, which are included in the automated control system of the oil pumping process.
• Construction of fiber-optic communication line.
• Installation of anti-erosion, fire-fighting structures within the boundaries of oil retention on the Latorytsia River.
Main technical characteristics:
The length of the pipeline removal route is 58.4 km
Diameter:
I thread - 530 mm
II thread - 720 mm
Project
Project customer:
CJSC "KazTransOil" (Republic of Kazakhstan)
Year of implementation: 2002
The purpose of the project: to ensure the reception and storage of oil from the fields of the Aktobe region, transportation to the LVDS "Kenkiyak" for further transport to the export oil pipelines Atyrau - Samara and the CPC system.
Main technical solutions:
• GSMP "Alibekmola":
- 6 steel tanks with a pontoon with a capacity of 5000 m 3 each;
- pump shop - 3 pump units ANDS-600-90 with a capacity of 600 m 3 / year each;
- site of filters-dirt traps;
- oil metering unit;
- site of safety valves;
- drainage capacity;
- cleaning and diagnostic start-up unit.
• The oil pipeline from pipes 530х7 12GSB on TU 14-3R 34-2000 with factory isolation in 3 layers.
Main technical characteristics:
Pipeline length:
Stage I - 16.0 km
Stage II - 30.5 km
Diameter - 530 mm
The capacity of the tank farm is 30 thousand m3
Oil pumping volume:
Phase I - 3.6 million tons / year
Phase II - 6.0 million tons / year
Feasibility study, working design, author's supervision of construction.
Project customer:
Branch of Druzhba Main Oil Pipelines of OJSC Ukrtransnafta (Ukraine)
Year of implementation: 1996 - 2001
The purpose of the project: pumping oil from ISTC "South" (port "South") to LVDS "Brody" for further supply to Ukrainian refineries and transit to Eastern Europe
Main technical solutions:
• Execution of a linear part of the oil pipeline from pipes with a diameter of 1020 mm, 12 mm thick with factory insulation.
• Equipping with a telemechanics system (ASUTP) produced by MMT, Hungary.
• Fiber optic (FOC) communication system.
• Use of shut-off valves with drive type IQ, Rotork.
• Starting and receiving unit of cleaning devices and diagnostic tools.
Main technical characteristics:
The length is 674 km
Diameter - 1020 mm
The number of intermediate NPS - 2
Productivity of the launch complex is 9 million tons / year
(without intermediate stations)
Capacity for full development - 30 million tons / year
Feasibility study, working design.
Project customer:
Supertanker Base Directorate in Matanzas, Cuba
Year of implementation: 1992
The purpose of the project: transportation of oil to the refinery in Cienfuegos.
Main technical characteristics:
The length of the pipeline is 190 km
Diameter - 530 mm
Number of SMP - 2
Capacity - 10 million tons / year
Project, working documentation, author's supervision of construction.
Project customer: Gruznafta (Georgia)
Year of implementation: 1980
The purpose of the project: transport of Georgian oil to the refinery in Batumi.
Main technical characteristics:
The length of the route is 426 km
Diameter - 530 mm
Capacity - 4.8 million tons / year
The capacity of the tank farms is 35 thousand m3
Number of SMP - 2
Number of draining stations – 2
Project, working documentation, author's supervision of construction.
Project customer: Yuzhnaftoprovod (USSR)
Year of implementation: 1975
The purpose of the project: transportation of high-viscosity Kazakh oils to the port of Aktau for further filling into tankers and sending to refineries in Baku, Volgograd and others.
Main technical characteristics:
The length of the route is 283 km
Diameter - 720 mm
Capacity - 15 million tons / year
The capacity of the tank farms is 100 thousand m3
Number of SMP - 3
End point – 1
Project, working documentation.
Project customer:
Ministry of Oil Industry of the USSR
Year of implementation: 1971
The purpose of the project: transportation of oil with high paraffin content to the refineries in Atyrau and Samara, as well as to railway filling stations.
Main technical solutions:
• The pipeline is equipped with oil heating points. Each SMP has 8 G9PO2V furnaces with a capacity of 600 m 3 / hour. The pumping temperature is about 60 ° C.
• The pipeline is equipped with automation and telemechanics.
Main technical characteristics:
The length of the pipeline is 1500 km
Diameter:
- on the section Uzen-Atyrau (L = 683 km) - 1020 mm
- on the section Atyrau-Samara - 720 mm
Bandwidth:
- on the Uzen-Atyrau section - 40 million tons / year
- on the Atyrau-Samara section - 17 million tons / year
Reservoir tank capacities:
- GSMP "Uzen" - 120 thousand m3
- SMP "Atyrau" - 180 thousand m3
Number of SMP - 8